E4将风险管理和最终BIA与技术联系起来

3.0 2025-05-12 62 0 653 KB 39 页 PDF
侵权投诉
E4将风险管理和最终BIA与技术联系起来
E4将风险管理和最终BIA与技术联系起来
E4将风险管理和最终BIA与技术联系起来
E4将风险管理和最终BIA与技术联系起来
E4将风险管理和最终BIA与技术联系起来
摘要:

Defining the Disaster Recovery Scenario and Solution(s): Connecting the Risk Management and final Business Impact Analysis to technologyMay 6-8, 2024 | Charlotte, NCHoutkin, AndreaAgendaIntroductionBIA Risk PointsDR Scenario DescriptionsThe DR solutions’ technical design based on the DR ScenarioValidating the DR ScenarioIntroductionBIA Risk PointsDR Scenario DescriptionsThe DR solutions’ technical design based on the DR ScenarioValidating the DR ScenarioConnecting the Risk Management and final Business Impact Analysis to technology: IntroductionThe Disaster Recovery (DR) scenario not only prioritizes risks posed against the critical business process but also defines the solutions – what we are building to - to mitigate the identified risk. The scenario joins the following components to ultimately define the disaster recovery solution: 1. Current Business and technical risk;2. Standard risks based on weather, malicious intent, climax, financial profile, politics and operations process;3

展开>> 收起<<
E4将风险管理和最终BIA与技术联系起来

共 39 页,预览3页

还剩36页未读, 继续阅读

声明:企商查报告文库所有资源均是客户上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作商用。
作者: 分类: 属性:39 页 大小:653 KB 格式:PDF 时间:2025-05-12

开通VIP享超值会员特权

  • 多端同步记录
  • 高速下载文档
  • 免费文档工具
  • 分享文档赚钱
  • 每日登录抽奖
  • 优质衍生服务
/ 3
客服
关注