排队中发电机并网积压的现状与驱动因素

3.0 2025-05-12 85 0 9458 KB 60 页 VIP免费 PDF
侵权投诉
排队中发电机并网积压的现状与驱动因素
排队中发电机并网积压的现状与驱动因素
排队中发电机并网积压的现状与驱动因素
排队中发电机并网积压的现状与驱动因素
排队中发电机并网积压的现状与驱动因素
摘要:

Queued Up: Status and Drivers of Generator Interconnection BacklogsJoachim Seel, Lawrence Berkeley National LaboratorySolar and Storage Finance USAMay 2, 2024This work was funded by the U.S. Department of Energy under Contract No. DE-AC02-05CH11231. The views and opinions of the authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof, or The Regents of the University of California. Image source: Licensed from Shutterstock2Current interconnection process was designed in 2003 for an electricity system with fewer, larger, centralized power plants (though RTOs have implemented some reforms)A project developer initiates a new interconnection request (IR) and thereby enters the queueA series of interconnection studies establish what new transmission equipment or upgrades may be needed and assigns the costs of that equipmentThe studies culminate in an interconnection agreement (IA): a contract between the ISO or utility and t

展开>> 收起<<
排队中发电机并网积压的现状与驱动因素

共 60 页,预览5页

还剩55页未读, 继续阅读

排队中发电机并网积压的现状与驱动因素
排队中发电机并网积压的现状与驱动因素
排队中发电机并网积压的现状与驱动因素
排队中发电机并网积压的现状与驱动因素
排队中发电机并网积压的现状与驱动因素
声明:企商查报告文库所有资源均是客户上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作商用。
属性:60 页 大小:9458 KB 格式:PDF 时间:2025-05-12

开通VIP享超值会员特权

  • 多端同步记录
  • 高速下载文档
  • 免费文档工具
  • 分享文档赚钱
  • 每日登录抽奖
  • 优质衍生服务
/ 3
客服
关注